Our Projects
Industrial
REFINERY FACILITY
Location:
Confidencial
Abu Dhabi
Scope:
Constraction (LOD 200 to LOD 400):
Structural scope for reinforcement concrete and steel
Desription:
Polyolefin facility in Abu Dhabi, a major industrial project is underway, poised to become one of the UAE’s largest. With an overall investment of $6.2 billion, this initiative is crucial for our client’s expansion, increasing production capacity to an impressive 6.4 million tonnes. Upon completion in 2025, this complex is set to claim the title of the world’s largest single-site polyolefin facility, marking a significant leap forward in the global industrial landscape.
Industrial
REFINERY FACILITY
Location:
Singapore
Scope:
Constraction (LOD 200 to LOD 400):
Electrical services
Desription:
The Singapore Refinery is a world-scale refining complex across two sites – one on the mainland and another on Jurong Island. Together with the Singapore Chemical Plant, they form the largest integrated manufacturing complex in the world.
The expansion will boost the production capacity of cleaner fuels with lower sulfur content by 48,000 barrels per day, and lubricant base stocks by 20,000.
Industrial
Vaccine facility
Location:
Singapore
Scope:
Constraction (LOD 200 to LOD 400):
HVAC services
Desription:
This project is the first-of-its-kind, fully digitalised, modular vaccine manufacturing facility of 35,000 sqm with over $460 millions. It will be capable of producing vaccines on a large scale for Asia.
The facility will be designed to be carbon neutral and allow for future modifications.
The facility will be able to meet the demand for vaccines at both regional and global levels, ensuring access to advanced vaccines and treatments.
Industrial
data center
Location:
Singapore
Scope:
Design adoptation (LOD 200 to LOD 400) and Installation for:
Electrical
Technology
Security
PAVA
Desription:
The new 11-storey data centre is 170,000 sqm design with over $1 billion budget and utilizes innovative, hyper-efficient technology to accommodate Singapore’s limited land and resources. When completed, it is poised to be one of the most advanced and energy efficient data center facilities in the world.
Infrastructural
zayed city
Location:
Musanada
UAE, Abu Dhabi
Scope:
Details design and construction supervision for:
Electrical
Sewer
Irrigition
Road
Desription:
Construction stage for infrastructural project an Emirati housing development which will eventually comprise 3,000 villas with area of 5.4 sq.km
Industrial
Golden finger
Location:
Unilever
UAE, Dubai
Scope:
Basic, Detail Design, and Construction supervision fro:
Architectural
Structural
MEP
Technology
Desription:
Greenfield project of new personal-care products manufacturing plant in Dubai Industrial Park. Build-up area 22,000 sq.m. Our team helped Client carry over BIM model through entire life cycle starting with Concept Design, Details Design and through entire construction stage.
Commercial
shopping mall "forum lviv"
Location:
Multi Corporation
Ukraine, Lviv
Scope:
Conceptual, Basic, and Detail Design, and Construction Supervision for:
Architectural
Stractural
MEP
Desription:
Project developed in Autodesk Revit, which allowed to provide Client with 3D coordination services, clashes reports, insolation study, laser scanning, and other Services. Approximately 70,000 sq.m of total area (35,000 sq.m. of GLA) with fashion shops, retail units, restaurants, cinema with 6 screens and 4DX screen, and entertainment facilities. An underground car parking for 600 cars.
Industrial
CAR ASSEMBLY PLANT
Location:
Great Wall Motors
Russia, Tula
Scope:
Basic and Detail Design for:
Architectural
Stractural
MEP
Desription:
Great Wall Motors’ Russian plant in Tula. Seven different offices worked
together in one model to design a plant with a capacity of 150,000 cars a year.
Industrial
SOYBEAN CRUSHING & EXTRACTION PLANT
Location:
Cargill
Zambia, Lusaka
Scope:
Stractural
MEP
Technology
Desription:
Reconstruction of soybean crushing and extraction plant. The facility was in a poor condition maintenance-wise and safety was far below Cargill standards. Construction area – 5,100 sq.m. All works have been carried out in BIM with Prague and Dubai office.